|
Code |
Title |
Duration
days |
Dates |
|
Venue
Fee |
|
|
|
|
start |
end |
|
|
click to see the course
outline |
Vibration Analysis |
|
|
|
|
|
VA01 |
Vibration Analysis Level I |
4 |
|
|
|
|
VA02 |
Vibration Analysis Level II |
4 |
|
|
Blackpool |
|
VA03 |
Vibration Analysis Introduction |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
PdM & Condition Monitoring |
|
|
|
|
|
PD01 |
Machine Failure, PdM and Vibration Analysis |
5 |
|
|
Blackpool |
|
PD02 |
Predictive Maintenance Implementation Integration & Management |
5 |
|
|
Blackpool |
|
PR03 |
Infrared Thermography Level 1 |
|
|
|
Blackpool |
|
PR04 |
Infrared Thermography Level 2 |
|
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
Maintenance Management & Technology |
|
|
|
|
|
MT01 |
A - Z of Best Practices Module 1 |
5 |
|
|
Blackpool |
|
MT02 |
A - Z of Best Practices Module 2 |
5 |
|
|
Blackpool |
|
MT03 |
Implementation of Reliability Centred Maintenance (RCM) & Total Productivity
Maintenance (TPM) |
5 |
|
|
Blackpool |
|
MT04 |
Management of Predictive Maintenance & Reliability Centred Maintenance |
5 |
|
|
Blackpool |
|
MT05 |
Surface Equipment - Maintenance and Operation |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
Rotating Equipment |
|
|
|
|
|
RE01 |
Analytical Prevention of Machinery Failure, PM & Troubleshooting of Plant
Rotating Equipment |
5 |
|
|
Blackpool |
|
RE02 |
Centrifugal Compressor - Trouble Shooting & Failure Analysis |
4 |
|
|
Blackpool |
|
RE03 |
Centrifugal Compressor & Steam Turbine Design Operations & Maintenance |
5 |
|
|
Blackpool |
|
RE04 |
Design & Operating Conditions of Centrifugal Pumps & Prime Movers (VSD & FSM) |
5 |
|
|
Blackpool |
|
RE05 |
Industrial Equipment Compressors Pumps Motors and Variable speed drives
selection and Sizing Applications |
5 |
|
|
Blackpool |
|
RE06 |
Practical Pump Technology |
5 |
|
|
Blackpool |
|
RE07 |
Pumps & Compressors: Predictive Maintenance &
Diagnostics |
5 |
|
|
Blackpool |
|
RE08 |
Principles & Operation of Centrifugal Pumps |
5 |
|
|
Blackpool |
|
RE09 |
Principles of Rotating Equipment |
5 |
|
|
Blackpool |
|
RE10 |
Rotating Equipment Fundamental & Performance Monitoring |
5 |
|
|
Blackpool |
|
RE11 |
Screw Gas Compressors & Dry Gas Seals Applications |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
Reciprocating Equipment |
|
|
|
|
|
RC01 |
Diesel & Gas Engines - Design, Maintenance & Operation |
5 |
|
|
Blackpool |
|
RC02 |
Reciprocating Compressors Design Operation & Maintenance |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
Static Equipment |
|
|
|
|
|
SE01 |
Failures Failure Prevention and Repairs to Static Process Equipment & Piping |
5 |
|
|
Blackpool |
|
SE02 |
Management of Boilers, Steam Turbines & Steam Plant |
5 |
|
|
Blackpool |
|
SE03 |
Maintenance of Process Plant & Equipment |
5 |
|
|
Blackpool |
|
SE04 |
Mechanical Integrity & Reliability In Refineries Petrochemical & Process
Plants |
5 |
|
|
Blackpool |
|
SE05 |
Piping Systems & Pipeline Integrity with an Application of ASME B31 Codes |
5 |
|
|
Blackpool |
|
SE06 |
Risk Based Inspection Implementation Integration & Management |
5 |
|
|
Blackpool |
|
SE07 |
Practical Valve Technology |
5 |
|
|
Blackpool |
|
SE08 |
Statutory Inspection of Pressure Vessels Implementation Integration &
Management |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
Process & Safety |
|
|
|
|
|
PS01 |
Fundamentals of Process Equipment & Control |
5 |
|
|
Blackpool |
|
PS02 |
Logout/Tagout Procedures - OSHA & ANSI |
5 |
|
|
Blackpool |
|
|
|
|
|
|
|
|
|
API Codes, Standards & Recommended Practices. |
|
|
|
|
|
AP01 |
API 579 Fitness for Service |
5 |
|
|
Blackpool |
|
AP02 |
API 510 Pressure Vessel Inspection |
5 |
|
|
Blackpool |
|
AP03 |
API 653 Above Ground Storage Tank Inspection |
5 |
|
|
Blackpool |
|
AP04 |
API 580 Risk Based Inspection |
5 |
|
|
Blackpool |
|
AP05 |
|